Chapter 4 converts the requirement set from Chapter 3 into the transformer’s first discrete electrical decisions: turns ratio, primary and secondary turns, allowable volt-seconds, duty-cycle or gain window, and reset margin. These quantities cannot be solved independently. A ratio that produces the desired output voltage may still violate flux-density, reset, integer-turn, regulation, or winding-loss constraints.
← Previous Chapter
Chapter 3 — Defining Transformer Requirements and the Operating Window
Next Chapter →
Chapter 5 — Core Selection, Materials, and Magnetic Geometry
In This Chapter — Click to Expand
Table of Contents
CHAPTER SCOPE
Solve the Electrical Ratio Before Committing to Core Geometry
This chapter derives the feasible turns-ratio and volt-second window. Chapter 5 will use that window to select core material and geometry; Chapter 6 will close the final primary turns, flux density, and saturation margin.
The objective is not to force one continuous mathematical ratio. It is to identify integer-turn candidates that satisfy the converter and magnetic requirements together.
1. Turns Ratio Is a Converter Relationship Before It Is a Transformer Geometry
Turns ratio is often introduced as a simple transformer property, but in a power converter it is first a relationship between converter input, switch topology, secondary rectification, duty or gain control, device drops, and required output voltage. Only after that relationship is established should it be converted into integer turns.
2. Define the Turns-Ratio Convention Explicitly
This guide defines the primary-to-secondary turns ratio as:
A ratio greater than one therefore means more primary turns than secondary turns. Always state the convention because many references and software tools use the reciprocal.
3. The Ideal Transformer Voltage and Current Relationships
For the ideal transformer:
Current transforms inversely:
These equations establish the ideal magnetic coupling relationship, but they do not yet include the converter topology, rectifier drops, duty cycle, resonant gain, leakage, regulation, or winding resistance.
4. Replace the Ideal Voltage Ratio with the Converter Conversion Factor
A useful general converter-level representation is:
Here KC is a dimensionless conversion factor that represents the topology and operating state. Depending on the converter, it can include bridge utilization, duty cycle, phase shift, resonant gain, rectifier arrangement, and other idealized conversion terms. The required continuous turns ratio is then approximately:
SOLIDMAG ENGINEERING INSIGHT
Do Not Hide the Topology inside the Transformer Ratio
Keep the transformer ratio and converter conversion factor separate. That makes it clear whether a voltage mismatch should be solved with turns, duty/gain range, rectification, or topology.
5. Topology Changes the Effective Primary Voltage
The same DC bus does not imply the same transformer primary voltage. A half bridge typically applies approximately half the bus to the primary, while a full bridge can apply approximately the full bus. Push-pull energizes one half-primary at a time, and forward converters use a single-ended active interval followed by reset.

Figure 4-1. Topology changes the voltage actually applied to the transformer primary. Turns-ratio design must use winding voltage and timing, not DC bus voltage alone.
6. Rectification and Device Drops Change the Secondary Requirement
The secondary requirement depends on the rectifier and output stage. Center-tapped rectifiers, full-wave bridges, synchronous rectification, doubler arrangements, and multiple outputs create different relationships between secondary winding voltage and regulated DC output. Semiconductor drops, dead time, conduction loss, and output-ripple allowance should be included in the ratio target rather than added after the transformer is built.
7. Volt-Second Balance Determines the Magnetic Trajectory
Volt-second balance is the magnetic closure condition behind turns-ratio design. Define the positive and negative primary volt-second areas as:
For a steady magnetic cycle that returns to the same flux operating point:
8. Positive and Negative Volt-Seconds Must Close over the Magnetic Cycle
Positive and negative volt-second areas do not need equal voltage or equal time independently. They need equal and opposite signed area. A forward converter may use a short high-magnitude reset pulse; a bridge may use symmetric positive and negative pulses; a resonant converter may have a shaped waveform whose integral still closes the magnetic cycle.

Figure 4-2. Volt-second balance examples. Different voltage and timing combinations can reset the core, but any residual signed volt-seconds shift the magnetic operating point.
9. Volt-Seconds Convert Directly into Flux-Density Excursion
Volt-seconds convert directly into flux-density excursion:
That relationship is why turns ratio and primary turns cannot be treated as independent calculations. The chosen primary turns must simultaneously support the desired secondary voltage and the allowed core flux excursion.
10. Primary Turns Must Satisfy Worst-Case Volt-Seconds
Once an allowable flux-density excursion and candidate effective core area are available, the minimum primary turns required by worst-case volt-seconds is:
At this stage, Ae may be a candidate or range rather than a final core selection. Chapter 5 will choose the magnetic geometry, and Chapter 6 will close the final turns and saturation margin.
11. Duty Cycle Is a Magnetic Design Variable
PWM-operated converters use duty cycle as part of the winding-voltage relationship and the volt-second requirement. Treat duty as a window, not a nominal number:
The turns ratio must leave enough control range at low line and high line while also respecting magnetic reset and flux limits.
12. Forward-Converter Reset Consumes Duty-Cycle Budget
Single-ended forward converters must reserve part of every switching cycle for reset and switching transitions. The reset time required by ideal volt-second cancellation is:
A useful duty-budget condition is:
This is why a ratio that appears correct from output-voltage algebra can still be unusable if it requires more duty than the magnetic reset mechanism can support.
13. Bridge Converters Use Alternating Polarity but Still Need Symmetry
Half-bridge, full-bridge, and push-pull converters use alternating polarity, but symmetry remains critical. Unequal bridge midpoint voltages, mismatched primary halves, unequal switch delays, or control offsets can create residual volt-seconds and flux walking. Ratio design should therefore preserve headroom for timing error, dead time, and real device drops rather than assuming an ideal 50/50 waveform.
14. Resonant Converters Replace Fixed Duty with a Gain/Frequency Window
Resonant converters often hold bridge duty approximately fixed and regulate primarily by switching frequency. The converter factor KC then includes the resonant gain at the operating point. The transformer ratio must be selected so the required gain remains inside the acceptable frequency, current, and soft-switching window rather than merely matching nominal resonance.
EARLY ENGINEERING ACCESS
Get Your First Custom Magnetic Design for $49
Need a custom inductor, flyback transformer, or currently supported LLC/resonant transformer design for a real project? SolidMagnetics Early Engineering Access gives you a lower-cost way to evaluate the platform while it continues to expand.
STANDARD SINGLE DESIGN PRICE: $249 • EARLY ACCESS PRICE: $49
Use coupon code EARLYACCESS. Your supported design package can include:
- Candidate magnetic design output and recommended design direction
- SolidWorks Reference CAD and STEP export where supported
- Engineering drawings, BOM, winding, and design data where supported
- A practical starting point for component matching, simulation, prototyping, or further development
Offer details: Limited to the first 10 qualified paid projects. One discounted project per customer. Expires February 12, 2027, or when all 10 uses are claimed, whichever comes first.
SolidMagnetics-generated designs are engineering starting points intended to accelerate development. Final component selection, manufacturability, tolerances, winding construction, insulation, creepage and clearance, thermal performance, regulatory requirements, and production suitability must be verified for the intended application.
15. Turns Ratio Must Work across the Entire Operating Window
The required continuous ratio should be evaluated at every relevant operating corner:
Each corner c can have different input voltage, output voltage target, duty or gain factor, device drops, and control limits. The intersection of all valid constraints produces a feasible ratio interval:

Figure 4-3. Turns-ratio feasibility window across the converter operating range. The final ratio must satisfy every required line, load, control, and reset corner—not only the nominal point.
16. Continuous Ratio Targets Must Become Integer Turns
The continuous target ratio is only a starting point. Physical windings require integer turns. For candidate i:
Changing either winding by one turn can shift the ratio enough to affect regulation, control range, flux, window fill, and copper loss—especially when the secondary has only a few turns.
17. Ratio Error Is Only One Criterion for an Integer Candidate
A simple ratio-error metric is:
But the candidate with the smallest ratio error is not automatically the best design. Candidate screening must also include minimum primary turns for flux, secondary voltage at every operating corner, duty/gain headroom, window utilization, winding resistance, leakage/capacitance implications, manufacturability, and available bobbin pinout.

Figure 4-4. Integer-turn candidate comparison. A realizable transformer ratio must be selected from discrete primary and secondary turns while preserving voltage regulation, flux margin, control range, and winding feasibility.
18. Winding Drops, Regulation, and Load Range Shift the Required Ratio
Copper resistance and semiconductor drops increase with load and temperature, so the required effective ratio can shift across the operating window. The specification should identify which drops are included in the continuous ratio target and which are left to converter control. Avoid compensating for uncertain losses by arbitrarily changing turns without checking the resulting high-line and light-load behavior.
19. Multiple Outputs Require a Common Primary-Turn Decision
Multiple-output transformers share the same primary turns and core flux. Each secondary therefore produces its own discrete ratio relative to the common primary. The primary-turn choice should be selected with all required output rails in view, especially when one low-voltage rail has very few turns and therefore coarse integer resolution.
20. Auxiliary Windings Need Their Own Operating-Window Check
Auxiliary windings for bias supplies, gate-drive power, sensing, or housekeeping can fail at operating corners that are unimportant to the main output. Their voltage should be checked during startup, light load, burst mode, high line, low line, and any condition in which the main regulated output is controlled differently.
21. Worked Example — 400 V Bus, 48 V Output, Half-Bridge vs Full-Bridge
Consider a simplified 400 V DC bus feeding a 48 V isolated output. Ignore device drops and use a unity idealized conversion factor other than bridge utilization for illustration.
| Case | Approx. primary voltage | Continuous ideal ratio a = Np/Ns | Interpretation |
|---|---|---|---|
| Half bridge | 200 V | 200/48 ≈ 4.17 | A candidate might begin near 25:6, 29:7, 33:8, etc., then be checked against duty/gain and flux requirements. |
| Full bridge | 400 V | 400/48 ≈ 8.33 | Approximately twice the half-bridge ratio for the same output because twice the primary voltage is applied. |
This example is intentionally idealized. A real design includes the actual duty or phase-shift range, output rectifier, device drops, regulation headroom, integer turns, and worst-case volt-seconds.
WORKED EXAMPLE TAKEAWAY
Ratio Follows Winding Voltage, Not Bus Voltage
The same 400 V source can require very different transformer ratios depending on how the converter applies that bus voltage to the primary.
22. Candidate Turns Comparison and Feasibility Screening
A practical candidate table should compare several nearby integer turn pairs and reject any candidate that violates a hard constraint. Ratio error is useful for ranking only after flux, control range, reset, winding fit, and output-voltage requirements are satisfied.
| Candidate check | Pass/fail question |
|---|---|
| Primary turns | Does Np satisfy worst-case volt-seconds and flux requirement? |
| Secondary turns | Does Ns produce the required output at every operating corner? |
| Control range | Is sufficient duty/gain/phase-shift margin available? |
| Reset | Can the core fully reset within the available interval? |
| Integer resolution | Are low-turn secondaries too coarse for regulation? |
| Window fit | Can all windings and insulation physically fit? |
| Loss / parasitics | Does the turn count create unacceptable copper, leakage, or capacitance penalties? |
23. Recommended Turns-Ratio and Volt-Second Workflow
- Start from the locked Chapter 3 operating-window requirement set.
- Define the turns-ratio convention and actual primary/secondary winding voltage waveforms.
- Create the topology-dependent conversion factor for each operating corner.
- Calculate the continuous required turns ratio at low line, nominal line, high line, startup, and other required states.
- Calculate positive and negative/reset volt-seconds for every magnetic cycle.
- Determine the minimum primary-turn requirement from allowable flux excursion and candidate core area.
- Verify duty-cycle, reset-time, phase-shift, or resonant-gain headroom.
- Intersect all operating-corner constraints to obtain the feasible continuous ratio window.
- Enumerate nearby integer primary/secondary turn pairs.
- Screen candidates against flux, output voltage, control range, reset, winding fit, and manufacturing constraints.
- Carry the feasible turns candidates into Chapter 5 for core/material/geometry selection.
- Revisit the ratio if core selection or integer-turn feasibility eliminates the candidate set.

Figure 4-5. Turns-ratio and volt-second design workflow. Continuous converter requirements are converted into balanced volt-seconds, primary-turn limits, integer-turn candidates, and a feasible candidate set for core selection.
24. Chapter 4 Engineering Checklist
- The turns-ratio convention Np/Ns is explicitly defined.
- Primary winding voltage is derived from the actual topology rather than assumed from the DC bus.
- Secondary rectifier topology and device drops are included.
- The converter conversion factor is evaluated at all required operating corners.
- Positive and negative/reset volt-seconds close over the magnetic cycle.
- Worst-case volt-seconds are identified.
- Minimum primary turns are consistent with allowable flux excursion.
- Duty-cycle, reset-time, dead-time, phase-shift, or gain limits are respected.
- Low-line and high-line control headroom are both checked.
- Continuous ratio requirements are converted into integer turns.
- Integer candidates are screened for output regulation and flux, not ratio error alone.
- Multiple outputs and auxiliary windings are included.
- Temperature- and load-dependent voltage drops are considered where material.
- Feasible turn pairs are ready to be evaluated against core and window geometry in Chapter 5.
25. Conclusion — Ratio and Flux Must Be Solved Together
Turns ratio determines how the converter uses transformer voltage; primary turns determine how the magnetic core sees volt-seconds. In a real design those two decisions are coupled. The correct solution is therefore not simply the ratio that reproduces nominal output voltage—it is the integer turn set that satisfies output, control, reset, flux, winding, and manufacturing constraints across the operating window.
Chapter 5 now takes that feasible electrical candidate set and evaluates core material, core geometry, window area, magnetic path dimensions, thermal capability, and manufacturability.
Technical References for This Chapter
The equations in this chapter follow standard transformer and isolated-converter relationships. Production work should use the actual converter waveforms, controller limits, semiconductor data, rectifier characteristics, and magnetic material/core data for the selected implementation.
- Fundamentals of Power Electronics, Robert W. Erickson and Dragan Maksimović, 3rd Edition, Springer.
- Transformer and Inductor Design Handbook, Colonel Wm. T. McLyman, 4th Edition, CRC Press.
- Switching Power Supply Design, Abraham I. Pressman, Keith Billings, and Taylor Morey, 3rd Edition, McGraw-Hill.
- Applicable controller and semiconductor manufacturer application notes for the selected forward, push-pull, half-bridge, full-bridge, flyback, or resonant topology.
Related SolidMagnetics Resources
Ultimate Guide to Transformer Design
Return to the complete 15-chapter transformer-design roadmap.
Chapter 3 — Transformer Requirements and Operating Window
Review the electrical, current, thermal, mechanical, isolation, manufacturing, and operating-corner requirements feeding this chapter.
Chapter 5 — Core Selection, Materials, and Magnetic Geometry
Use the feasible ratio and turn candidates to select core material and geometry.
Magnetic Design Automation
Explore the SolidMagnetics design-tool directory and automated magnetic-design workflows.
SOLIDMAGNETICS DESIGN TOOLS
Explore Magnetic Design Automation
SolidMagnetics is developing workflows that connect converter requirements, turns-ratio calculations, magnetic candidate selection, CAD-ready geometry, manufacturing outputs, and validation into one traceable design process.
← Previous Chapter
Chapter 3 — Defining Transformer Requirements and the Operating Window
Next Chapter →
Chapter 5 — Core Selection, Materials, and Magnetic Geometry
READY TO APPLY THIS?
Turn Your Requirements Into a Real Magnetic Design
If you are working on a real inductor, flyback transformer, or supported LLC/resonant transformer project, SolidMagnetics can help you move faster from electrical requirements to calculated magnetic geometry and engineering output.
FOUNDING EARLY ENGINEERING ACCESS: $249 → $49
Use coupon code EARLYACCESS for the Single Design package. This offer is intended for engineers who want to evaluate the current SolidMagnetics workflow and provide practical feedback that helps improve the platform.
What the Current Package Can Include
- Requirements and feasibility review
- Candidate design comparison and recommended design
- Electrical, magnetic, loss, and thermal calculations
- SolidWorks Reference CAD and STEP files where supported
- Drawings, BOM, winding, and engineering data where supported
- A basis for comparing custom geometry with commercial core and bobbin options
Early Access Offer Details
- Single Design standard price: $249
- Early Engineering Access price: $49
- Coupon code: EARLYACCESS
- Limited to 10 total qualified paid projects
- One discounted project per customer
- Expires February 12, 2027, or when all 10 uses are claimed
- Brief post-delivery feedback is requested
The standard package provides a Reference CAD representation of the generated design rather than the complete underlying SolidMagnetics parametric automation structure. Fully parametric engineering CAD may be available separately for qualifying advanced or Enterprise projects.
Early Access calculations, CAD, drawings, and related deliverables are intended to accelerate engineering evaluation and prototype development. Final mechanical, electrical, thermal, insulation, regulatory, manufacturing, and production validation remains the responsibility of the customer and their engineering team.
