Chapter 14: Manufacturing, Testing, Tolerances, and Validation

Chapter 13 completed the transformer construction by closing the isolation and EMI barrier. Chapter 14 now turns the engineering design into a controlled manufacturing process: winding instructions, materials, critical dimensions, tolerances, measurement methods, first-article inspection, end-of-line tests, process capability, converter-level validation, and change control.

The central principle is traceability. A production value such as ‘Lm = 158.5 µH’ is incomplete unless the tolerance, test frequency, amplitude, winding connections, temperature, fixture, instrument, and acceptance method are defined. The same is true for leakage, turns ratio, DCR, capacitance, dielectric strength, temperature rise, and every other critical transformer characteristic.

In This Chapter — Click to Expand

Table of Contents

DESIGN ASSUMPTION

Illustrative Production Limits Are Not Released Specifications

The worked production values in this chapter are clearly labeled examples used to demonstrate tolerance and capability calculations. They do not replace the final tolerance analysis from the converter, supplier capability study, or certification plan.

Routine, type, qualification, and audit tests must be selected from the governing product standard, approved safety construction, customer specification, and manufacturing quality plan.

IEC/IEEE 61007-389:2026 is used as a current reference for electronics-transformer measurement methods, not as a substitute for product-specific safety or qualification standards.

1. Manufacturing Release Starts with a Frozen Design Definition

Production release should occur only after the electrical, magnetic, winding, thermal, insulation, and EMI designs are mutually consistent. The released configuration should have a revision-controlled drawing, BOM, winding specification, test specification, and validation record.

2. The Manufacturing Package Must Define More Than Turns Count

  • Core manufacturer, part number, material, gap / AL requirement, and assembly method.
  • Bobbin / former, orientation, pin numbering, and critical dimensions.
  • Primary, secondary, and auxiliary turns by physical section.
  • Wire/litz/foil construction, insulation, and approved alternates.
  • Winding order, start/finish, polarity, margins, interleaving, and spacing.
  • Tape, sleeving, barrier, shield, adhesive, varnish, potting, and termination materials.
  • Lead routing and pin/foil-tab connections.
  • Critical creepage, clearance, and insulation dimensions.
  • Final Lm, leakage, ratio, DCR, CPS, dielectric, thermal, and mechanical requirements.
Released resonant transformer manufacturing package showing engineering drawing, BOM, winding table, polarity diagram, insulation details, critical dimensions, electrical test specification, and production-ready documentation.

Figure 14-1. Released resonant-transformer manufacturing package showing drawing, BOM, winding table, polarity, barriers, critical dimensions, and electrical test specification.

3. Separate Design Targets from Production Acceptance Limits

A design target is the preferred nominal value. A production acceptance limit defines what may ship. The generic two-sided specification is:

xspec=xnom±Δxx_{spec}=x_{nom}\pm\Delta x

Acceptance limits should come from converter tolerance analysis, safety requirements, thermal margin, EMI margin, and demonstrated manufacturing capability—not from a convenient round percentage.

4. Identify Critical-to-Quality Transformer Parameters

Critical-to-Quality ParameterWhy It Matters
Turns ratio / polarityOutput voltage, gain window, correct rectification.
LmGain, magnetizing current, circulating loss, ZVS.
Leakage / effective LrResonant frequency, gain, tank current.
DCRCopper loss and temperature.
CPS / shield capacitanceCommon-mode EMI current.
Dielectric integritySafety construction verification.
Creepage / clearance / insulation geometrySafety compliance.
Core/gap/ALLm, loss, flux, tolerance.
Winding placement / overlapLeakage, CPS, RAC.
Dimensions / pinsPCB fit and maintained safety spacing.

5. Turns Ratio and Polarity Should Be Verified on Every Production Unit

n=NPNSn=\frac{N_P}{N_S}
εn=nmeas−nnomnnom×100%\varepsilon_n=\frac{n_{meas}-n_{nom}}{n_{nom}}\times100\%

A ratio test should also verify polarity/phase. For center-tapped or multiple secondaries, verify each section and the intended series/parallel relationships.

6. Lm Must Be Measured with a Defined Test Condition

Lm∈[Lm,min,Lm,max]L_m\in[L_{m,min},L_{m,max}]

Define measurement frequency, amplitude, primary terminals, secondary/open condition, core assembly state, instrument/fixture, and reference temperature. A bare number without those conditions is not a reproducible specification.

7. Controlled Leakage Must Use the Same Measurement Definition as the Converter Model

Llk∈[Llk,min,Llk,max]L_{lk}\in[L_{lk,min},L_{lk,max}]

TI’s UCC25800-Q1 guidance measures leakage from the side where the resonant inductance is used, with the opposite winding shorted, at the resonant frequency. ST’s recent AN6464 similarly defines leakage between specific primary pins with only one secondary winding shorted and a specified test frequency/amplitude. The measurement definition is part of the resonant design.

ENGINEERING CAUTION

Never Change the Leakage Test Connection without Revalidating Lr

Different shorting configurations can produce different measured leakage values.

The production test must match the quantity used in the converter model.

8. Multiple Secondary Paths Need Leakage-Balance Tests

εL=|Llk,S1′−Llk,S2′|Llk,avg×100%\varepsilon_L=\frac{|L_{lk,S1}’-L_{lk,S2}’|}{L_{lk,avg}}\times100\%

ST AN6464 provides a practical example: the two leakage measurements obtained by shorting one secondary at a time are required to remain closely matched. A similar balance check is useful whenever alternating secondary paths should see the same resonant network.

9. DCR Must Be Referenced to a Defined Temperature

RT=Rref[1+αCu(T−Tref)]R_T=R_{ref}\left[1+\alpha_{Cu}(T-T_{ref})\right]

Production DCR is normally measured at an accessible reference temperature, then corrected or compared with a temperature-compensated limit. Record actual ambient/winding temperature during precision measurements.

10. Interwinding Capacitance Can Become a Production-Controlled Parameter

CPS≤CPS,maxC_{PS}\le C_{PS,max}

IEC/IEEE 61007-389:2026 explicitly includes transformer capacitance and dynamic common-mode capacitance test methods. If CPS is a design-critical EMI parameter, define it as a controlled production or audit characteristic with exact terminal/shield connections.

11. Dielectric Withstand Is a Routine Verification Only When Required by the Approved Construction

Vtest≥Vtest,requiredV_{test}\ge V_{test,required}

Whether dielectric withstand is performed on every unit, sampled, repeated at reduced voltage, or reserved for qualification depends on the approved standard and construction. IEC 61558-1 is one example of a transformer safety standard with dielectric-strength and repetition-test provisions, but it applies only where its scope/product path is relevant.

12. Partial Discharge Testing Requires a Defined Certification Requirement

Partial-discharge testing should not be added as an arbitrary quality test. If Chapter 13 certification analysis requires PD, define the voltage waveform/frequency, inception/extinction criterion, fixture, conditioning, and acceptance method in the approved test plan.

13. IEC/IEEE 61007-389:2026 Provides a Modern Electronics-Transformer Test Framework

IEC/IEEE 61007-389:2026 is specifically aimed at test procedures for transformers and inductors used in electronic applications and includes manufacturing/customer-acceptance methods. Its current test set includes DC and AC winding resistance, electric strength, effective inductance, transformer capacitance, interwinding capacitance, ratio, balance, thermal methods, dynamic common-mode capacitance, and equivalent-circuit parameters.

SOLIDMAG ENGINEERING INSIGHT

Use a Standard Test Method Where Possible, Then Add Application-Specific Conditions

Standardized measurement fundamentals make supplier and customer results easier to compare.

The LLC-specific shorting condition, resonant frequency, shield state, and winding connections still need to be stated explicitly.

14. First Article Inspection Should Verify Geometry and Electrical Performance Together

First article inspection should verify both dimensions and electrical behavior on the same units so correlations can be established between winding placement and Lm, Llk, CPS, DCR, and thermal behavior.

Δxrel=xmeas−xtargetxtarget×100%\Delta x_{rel}=\frac{x_{meas}-x_{target}}{x_{target}}\times100\%
  • Cross-section or X-ray/CT inspection where hidden geometry is critical.
  • Actual tape/barrier/spacing measurements.
  • Turns count and winding-section verification.
  • Electrical parameter set at controlled temperature.
  • Thermal and converter validation on selected first-article units.
  • Photographic build record for the approved construction.

15. Build a Golden Sample and a Golden Measurement Method

A golden sample is useful only if the measurement setup is also golden. Keep reference fixtures, compensation procedures, firmware/instrument settings, and known-good sample data under revision control.

16. Measurement Uncertainty Must Be Small Enough for the Tolerance Being Enforced

The instrument/fixture uncertainty must be small compared with the allowed tolerance. A simple test-uncertainty ratio can be written:

TUR=USL−LSL2UTUR=\frac{USL-LSL}{2U}

Do not assume one universal acceptable TUR; define measurement capability in the quality plan based on the consequence of a false pass or false fail.

17. Guardbanding Prevents Measurement Uncertainty from Creating False Passes

For a one-sided upper specification, a conservative guardband can require:

xmeas+U≤USLx_{meas}+U\le USL

For a lower specification:

xmeas−U≥LSLx_{meas}-U\ge LSL

Guardband rules should be agreed between engineering, quality, supplier, and customer where required.

18. Gauge R&R Separates Measurement Variation from Process Variation

σGRR=σrepeat2+σreprod2\sigma_{GRR}=\sqrt{\sigma_{repeat}^2+\sigma_{reprod}^2}
%GRR=6σGRRUSL−LSL×100%\%GRR=\frac{6\sigma_{GRR}}{USL-LSL}\times100\%

Measurement-system variation should be quantified before process capability is interpreted. A noisy leakage test can make a stable winding process look unstable—or hide real process drift.

19. Process Capability Shows Whether the Manufacturing Process Can Hold the Specification

For a stable, approximately normal process with two-sided limits:

Cp=USL−LSL6σC_p=\frac{USL-LSL}{6\sigma}
Cpk=min⁡(USL−μ3σ,μ−LSL3σ)C_{pk}=\min\left(\frac{USL-\mu}{3\sigma},\frac{\mu-LSL}{3\sigma}\right)

For a one-sided upper limit such as maximum DCR or CPS:

Cpk,U=USL−μ3σC_{pk,U}=\frac{USL-\mu}{3\sigma}

ENGINEERING CAUTION

Capability Indices Do Not Rescue an Incorrect Specification

A highly capable process can still build an electrically wrong transformer if the limits were not derived from the converter and safety requirements.

Specifications come first; capability shows whether the process can hold them.

20. Control Limits Are Not the Same as Specification Limits

x‾=1N∑i=1Nxi\bar{x}=\frac{1}{N}\sum_{i=1}^{N}x_i
s=∑i=1N(xi−x‾)2N−1s=\sqrt{\frac{\sum_{i=1}^{N}(x_i-\bar{x})^2}{N-1}}

Statistical control limits describe observed process behavior; engineering specification limits describe what the transformer is allowed to be. Do not substitute one for the other.

EARLY ENGINEERING ACCESS

Get Your First Custom Magnetic Design for $49

Need a custom inductor, flyback transformer, or currently supported LLC/resonant transformer design for a real project? SolidMagnetics Early Engineering Access gives you a lower-cost way to evaluate the platform while it continues to expand.

STANDARD SINGLE DESIGN PRICE: $249   •   EARLY ACCESS PRICE: $49

Use coupon code EARLYACCESS. Your supported design package can include:

  • Candidate magnetic design output and recommended design direction
  • SolidWorks Reference CAD and STEP export where supported
  • Engineering drawings, BOM, winding, and design data where supported
  • A practical starting point for component matching, simulation, prototyping, or further development

Offer details: Limited to the first 10 qualified paid projects. One discounted project per customer. Expires February 12, 2027, or when all 10 uses are claimed, whichever comes first.

SolidMagnetics-generated designs are engineering starting points intended to accelerate development. Final component selection, manufacturability, tolerances, winding construction, insulation, creepage and clearance, thermal performance, regulatory requirements, and production suitability must be verified for the intended application.

21. In-Process Controls Prevent Electrical Failures Before Final Test

  • Count turns by winding-machine program and/or in-process verification.
  • Control winding tension and traverse.
  • Use hard stops/fixtures for section position and overlap.
  • Measure critical tape/barrier thickness and margin placement.
  • Control gap spacers, adhesive, clamping, cure, and core mating surfaces.
  • Inspect litz stripping/solder wetting and foil-tab geometry.
  • Verify shield gap/termination before the winding is buried.
  • Use poka-yoke features for start/finish and polarity.

22. Material and Supplier Traceability Matter for Magnetics

Ferrite material, bobbin resin/CTI, wire insulation, litz construction, tape, sleeving, adhesive, varnish, potting, shield foil, and solder can all affect the approved design. Record supplier, lot, material designation, and approved alternates where relevant.

23. Workmanship Controls Must Protect the Electrical Design

Workmanship controls should explicitly protect the properties calculated in earlier chapters: no displaced margin tape, damaged insulation, unintended foil overlap, litz strand damage, core-gap contamination, shield closure, lead-routing changes, or winding bulges that alter leakage/CPS.

24. Prototype Validation Must Be Performed in the Real LLC Converter

Bench transformer measurements are necessary but not sufficient. Validate the prototype in the actual LLC converter across input voltage, load, frequency, temperature, startup, overload, burst/light load, and protection modes.

  • Gain/frequency operating points.
  • Primary ZVS and secondary commutation.
  • Tank current and magnetizing current.
  • Output regulation and transient response.
  • Core/winding hotspot temperature.
  • Conducted/radiated EMI and common-mode current.
  • Audible/acoustic behavior where relevant.

25. Resonant Frequency Confirms the Combined Lr and Cr Implementation

fr=12πLrCrf_r=\frac{1}{2\pi\sqrt{L_rC_r}}
Δfrfr≈−12(ΔLrLr+ΔCrCr)\frac{\Delta f_r}{f_r}\approx-\frac{1}{2}\left(\frac{\Delta L_r}{L_r}+\frac{\Delta C_r}{C_r}\right)

Measured converter resonance is an important system-level check that the production leakage / external Lr and resonant capacitor are behaving as modeled.

26. Thermal Validation Confirms the Loss Model and Hotspot Prediction

θth,eff=Thot−TambPtr\theta_{th,eff}=\frac{T_{hot}-T_{amb}}{P_{tr}}

Use Chapter 12 hotspot methods to correlate the production construction to the thermal model. If effective thermal resistance or hotspot offset changes after manufacturing changes, the design is no longer thermally equivalent.

27. EMI Validation Confirms the Real CPS and Shield Current Paths

Conducted/radiated EMI, transformer common-mode current, CPS, shield current path, and system grounding/chassis conditions should be measured on the product configuration. A transformer that meets the CPS bench limit can still behave differently if PCB/chassis parasitics dominate.

28. Environmental and Reliability Testing Should Follow the Product Mission Profile

Environmental and reliability tests should come from the product mission profile and governing standards: thermal cycling, humidity, vibration, shock, high-temperature operation, altitude, insulation aging, power cycling, or other relevant stress. Do not add unrelated qualification tests merely because they are common in another industry.

29. Worked Production Specification — 500 W / 48 V LLC Example

WORKED PRODUCTION EXAMPLE

Illustrative Limits for the 500 W / 48 V Design

The following limits are deliberately illustrative. They demonstrate how the preceding design targets can become measurable manufacturing specifications, but they have not been derived from a completed converter tolerance/capability study.

Assume the hybrid Chapter 8 architecture is selected for this example only, with transformer leakage nominally contributing 11.7 µH of total Lr.

Lm=158.5 μH±10%L_m=158.5\ \mu\mathrm{H}\pm10\%
Lm∈[142.7,174.4] μHL_m\in[142.7,174.4]\ \mu\mathrm{H}
Llk=11.7 μH±8%L_{lk}=11.7\ \mu\mathrm{H}\pm8\%
Llk∈[10.76,12.64] μHL_{lk}\in[10.76,12.64]\ \mu\mathrm{H}
ParameterIllustrative Production EntryMeasurement Condition
Turns ratio33:8 nominal; polarity requiredDefined ratio/polarity fixture
Lm158.5 µH ±10% examplePrimary terminals, secondary open; defined f/V
Leakage11.7 µH ±8% exampleDefined primary pins; defined secondary short; resonant-relevant frequency
Primary DCR≤ 55 mΩ example @ 20 °C reference4-wire preferred
Secondary DCR≤ 3.6 mΩ example @ 20 °C reference4-wire / low-resistance fixture
CPS≤ 15 pF exampleDefined P/S/shield connection and test frequency
DielectricPer approved Chapter 13 certification planDefined V/waveform/time/trip
Hotspot≤ approved thermal limitConverter validation at max ambient/load

ENGINEERING CAUTION

Do Not Copy These Example Tolerances into a Released Drawing

The ±10%, ±8%, DCR, and CPS limits above are teaching values.

Replace them with limits derived from the completed converter, thermal, EMI, safety, and supplier capability analyses.

Illustrative 500 W LLC transformer production specification sheet showing turns ratio, magnetizing inductance, leakage inductance, DCR, polarity, isolation, dielectric withstand, dimensions, tolerances, and test conditions.

Figure 14-2. Illustrative production specification sheet for the 500 W LLC transformer with nominal values, tolerances, and measurement conditions.

30. Worked First-Article and Process-Capability Example

Suppose an illustrative pilot build has Lm specification limits 142.7–174.4 µH, process mean 159.2 µH, and standard deviation 2.0 µH. The capability indices are:

Cp≈174.4−142.76(2.0)≈2.64C_p\approx\frac{174.4-142.7}{6(2.0)}\approx2.64
Cpk≈2.53C_{pk}\approx2.53

Those numbers would indicate a well-centered, narrow illustrative process relative to this example tolerance—assuming the process is stable, the distribution/capability model is appropriate, and the measurement system is adequate. They do not establish what Cpk target the project should require.

Illustrative First-Article ResultMeasuredExample LimitResult
Turns ratio4.12633/8 = 4.125 nominal; example ratio toleranceEvaluate
Lm159.2 µH142.7–174.4 µHPass
Leakage11.6 µH10.76–12.64 µHPass
Primary DCR52 mΩ≤ 55 mΩ examplePass
Secondary DCR3.4 mΩ≤ 3.6 mΩ examplePass
CPS11.2 pF≤ 15 pF examplePass
Hotspot86 °CPer approved Chapter 12 limitEvaluate against release limit
Illustrative LLC transformer magnetizing-inductance process-capability distribution showing LSL, USL, target, process mean, six-sigma spread, Cp about 2.64, and Cpk about 2.53.

Figure 14-3. Illustrative Lm process-capability distribution showing specification limits, mean, and process spread for the Chapter 14 worked example.

31. Define the Production Test Sequence

  1. Incoming material verification for core/material, bobbin, wire/litz/foil, insulation, shields, adhesives, and gap components.
  2. In-process winding program / turns / polarity / section-position checks.
  3. Visual/workmanship inspection before final assembly is hidden.
  4. Core assembly / gap / clamp / adhesive process control.
  5. Continuity and turns-ratio/polarity test.
  6. Lm and leakage test at defined conditions.
  7. DCR measurement with temperature compensation.
  8. CPS or capacitance-balance test if production-controlled.
  9. Dielectric / insulation test per approved plan.
  10. Final dimensional / pin / marking inspection.
  11. Data logging and unit/lot traceability.
  12. Audit/sample tests for RAC, temperature rise, PD, EMI, or other non-routine parameters where required.
Production transformer test flow showing incoming material inspection, winding process controls, assembly verification, electrical end-of-line tests, dielectric testing, traceability, audit testing, and shipment release.

Figure 14-4. Production transformer test flow from incoming materials through winding process controls, electrical end-of-line tests, dielectric verification, traceability, and audit testing.

32. Change Control Must Trigger Revalidation of Affected Parameters

ChangeParameters to Revalidate
Ferrite material / core supplierLm/AL, loss, saturation, thermal, gap process.
Bobbin / resin / geometryWindow fit, creepage/clearance, leakage, CPS.
Wire/litz/foil supplierDCR, RAC, fill, thermal, termination.
Tape / sleeving / insulationSafety, CPS, leakage, thermal, process.
Winding order / placementLeakage, CPS, RAC, EMI.
Gap / adhesive / clampingLm, loss, fringing, thermal.
Shield geometry / terminationCPS, EMI, shield loss, leakage.
Production equipment / programTurns, placement, tension, process capability.

SOLIDMAG ENGINEERING INSIGHT

Equivalent BOM Does Not Mean Electrically Equivalent Magnetics

A nominally equivalent tape thickness, litz construction, ferrite grade, or bobbin can change leakage, capacitance, RAC, temperature, or safety spacing.

Change control should follow the affected physics, not only the purchasing description.

  1. Freeze the validated transformer design revision.
  2. Create drawing, BOM, winding table, insulation stack, shield definition, and test specification.
  3. Convert every critical design target into acceptance limits derived from system margin.
  4. Define exact measurement conditions and fixtures.
  5. Validate measurement-system capability and uncertainty.
  6. Build first-article units and inspect hidden geometry.
  7. Measure ratio, polarity, Lm, Llk, DCR, CPS, dielectric, dimensions, and balance.
  8. Build the transformer into the real LLC converter and validate gain, ZVS, resonant frequency, current, thermal, EMI, startup, and protection modes.
  9. Run product-specific environmental/reliability qualification.
  10. Run pilot production and evaluate process stability/capability.
  11. Set routine, audit, and sample-test frequencies in the quality plan.
  12. Create golden samples, fixtures, compensation files, and test-data traceability.
  13. Release supplier/process alternates only after affected-parameter revalidation.
  14. Monitor yield, failure modes, drift, and field returns after production launch.
  15. Feed manufacturing data back into the automated design tolerance model.
Y=NpassNtested×100%Y=\frac{N_{pass}}{N_{tested}}\times100\%
PPMfail=NfailNtested×106PPM_{fail}=\frac{N_{fail}}{N_{tested}}\times10^6
End-to-end resonant transformer manufacturing and validation traceability from design requirements through drawing and BOM release, first article, production testing, converter validation, process capability, field feedback, and design-engine updates.

Figure 14-5. End-to-end manufacturing and validation traceability from design requirements through drawing/BOM, first article, production tests, converter validation, process capability, and field feedback.

34. Chapter 14 Engineering Checklist

  • Design revision is frozen and traceable.
  • Drawing/BOM/winding instruction completely defines the physical build.
  • Design targets are separated from acceptance limits.
  • Critical-to-quality parameters are identified.
  • Ratio and polarity tests are defined.
  • Lm test frequency/amplitude/connections/temperature are defined.
  • Leakage test shorting condition and frequency match the converter model.
  • Secondary leakage balance is checked where required.
  • DCR is temperature referenced.
  • CPS test condition is defined if controlled.
  • Dielectric and PD tests come from the approved certification plan.
  • Measurement uncertainty is known.
  • Guardbanding is defined where needed.
  • Gauge R&R / measurement-system capability is adequate.
  • Process capability is evaluated only after stability is demonstrated.
  • Control limits are not confused with specification limits.
  • In-process winding and insulation controls are defined.
  • Material/lot traceability is maintained.
  • First article verifies hidden geometry and electrical parameters.
  • Prototype is validated in the actual LLC converter.
  • Thermal and EMI models are correlated to hardware.
  • Environmental/reliability tests match the mission profile.
  • Routine, audit, and sample test plans are defined.
  • Engineering changes trigger physics-based revalidation.
  • Production yield/failure data feeds continuous design improvement.

CHAPTER TAKEAWAY

A Repeatable Transformer Requires a Repeatable Measurement Definition

Manufacturing quality is not only the ability to wind the same geometry repeatedly. It is also the ability to measure the resulting Lm, leakage, ratio, DCR, capacitance, dielectric integrity, and temperature in the same way every time.

The released design is complete only when the drawing, process, test method, tolerance, and system validation all describe the same transformer.

35. Conclusion — A Good Design Is One That Can Be Built and Measured Repeatedly

Chapter 14 converts the resonant transformer from a successful engineering prototype into a manufacturable component. Every important parameter is tied to a physical construction, a test definition, an acceptance limit, and a reason derived from converter performance, safety, EMI, thermal behavior, or mechanical fit.

That traceability is what allows automation to go beyond generating a calculation. A complete automated design system can carry requirements into CAD, winding instructions, BOM, drawings, production test limits, and validation records—and then use manufacturing measurements to improve future designs.

Chapter 15 closes the guide with practical end-to-end design examples and shows how those calculations, candidate searches, tolerances, CAD outputs, manufacturing files, and validation checks can be connected into an automated SolidMagnetics workflow.

Technical References for This Chapter

The manufacturing and measurement framework in this chapter is consistent with current electronics-transformer test methods and recent LLC manufacturer examples. The product-specific safety and qualification standards remain controlling for a released product.

RESONANT CONVERTER TRANSFORMER DESIGN

Ready to Design a Resonant Converter Transformer?

Enter your resonant-converter requirements and begin a SolidMagnetics transformer design workflow built around the electrical, magnetic, winding, thermal, mechanical, and manufacturing constraints that shape a practical LLC or related resonant transformer.

Use the design interface to define the converter operating range, transformer requirements, resonant and magnetizing inductance targets, winding priorities, isolation needs, thermal limits, physical constraints, and optimization goals.

Return to the Ultimate Guide to Resonant Converter Transformer Design

READY TO APPLY THIS?

Turn Your Requirements Into a Real Magnetic Design

If you are working on a real inductor, flyback transformer, or supported LLC/resonant transformer project, SolidMagnetics can help you move faster from electrical requirements to calculated magnetic geometry and engineering output.

FOUNDING EARLY ENGINEERING ACCESS: $249   →   $49

Use coupon code EARLYACCESS for the Single Design package. This offer is intended for engineers who want to evaluate the current SolidMagnetics workflow and provide practical feedback that helps improve the platform.

What the Current Package Can Include

  • Requirements and feasibility review
  • Candidate design comparison and recommended design
  • Electrical, magnetic, loss, and thermal calculations
  • SolidWorks Reference CAD and STEP files where supported
  • Drawings, BOM, winding, and engineering data where supported
  • A basis for comparing custom geometry with commercial core and bobbin options

Early Access Offer Details

  • Single Design standard price: $249
  • Early Engineering Access price: $49
  • Coupon code: EARLYACCESS
  • Limited to 10 total qualified paid projects
  • One discounted project per customer
  • Expires February 12, 2027, or when all 10 uses are claimed
  • Brief post-delivery feedback is requested

The standard package provides a Reference CAD representation of the generated design rather than the complete underlying SolidMagnetics parametric automation structure. Fully parametric engineering CAD may be available separately for qualifying advanced or Enterprise projects.

Early Access calculations, CAD, drawings, and related deliverables are intended to accelerate engineering evaluation and prototype development. Final mechanical, electrical, thermal, insulation, regulatory, manufacturing, and production validation remains the responsibility of the customer and their engineering team.

ABOUT THE AUTHOR

Stan Gibson

Electrical Engineer & Founder, SolidMagnetics

Stan Gibson is an electrical engineer and founder of SolidMagnetics, an engineering platform focused on magnetic-component design automation. His work includes power electronics, inductor and transformer design, magnetic-core selection, winding design, thermal analysis, and manufacturable CAD development. Through SolidMagnetics, he develops technical guides, calculators, and automated design tools intended to help engineers move from electrical requirements to practical magnetic-component designs.

View Full Author Profile