Chapter 6: Turns Ratio and Voltage-Gain Design

Chapter 5 defined the complete transformer operating window. Chapter 6 now selects the transformer turns ratio so the LLC converter can reach its required output voltage across input-voltage range, load, rectifier drop, and switching-frequency limits without forcing the resonant tank outside its practical gain or soft-switching region.

The important idea is that turns ratio is not chosen from input voltage divided by output voltage alone. The converter tank contributes a variable gain M, the bridge determines how much of the DC bus excites the tank, the secondary rectifier introduces its own voltage and current relationships, and the final winding ratio must be made from integer turns. Every ratio decision must therefore be fed back into the gain and reflected-load model.

In This Chapter — Click to Expand

DESIGN ASSUMPTION

Primary-to-Secondary Ratio and Common LLC Gain Convention

This chapter defines n = NP/NS. For the generalized first-pass DC relation, KB = 0.5 for a half-bridge primary and KB = 1 for a full-bridge primary.

VS,req is defined as the effective secondary winding voltage required by the selected rectifier convention. The winding called NS must therefore be defined consistently—for example, the full secondary winding for a bridge rectifier or the active half-winding for a center-tapped rectifier.

These relationships use the same LLC gain convention as Chapter 4, where M = 1 at the Lr–Cr series resonant frequency.

1. Turns Ratio Is a Converter-Level Design Variable

The transformer ratio determines the basic voltage scaling between primary and secondary, but in an LLC converter it also changes the gain the resonant tank must provide and the load reflected into that tank.

A ratio that is too high forces the converter to demand more tank gain, often pushing operation lower in frequency toward the boost and capacitive boundary. A ratio that is too low demands less gain but can force high-line operation to excessively high switching frequency.

SOLIDMAG ENGINEERING INSIGHT

Turns Ratio Places the Operating Window on the Gain Curve

The tank gain curve already exists after Chapter 4. Chapter 6 chooses n so the required low-line, nominal-line, and high-line operating points land in useful portions of that curve.

The correct ratio minimizes unnecessary frequency excursion while preserving gain and soft-switching margin.

2. Define the Turns-Ratio Convention Before Calculating Anything

Define the primary-to-secondary turns ratio as:

n=NPNSn=\frac{N_P}{N_S}

For the ideal transformer portion of the model:

VPVS=NPNS=n\frac{V_P}{V_S}=\frac{N_P}{N_S}=n

The ideal current ratio is inverse to the voltage ratio:

ISIP=n\frac{I_S}{I_P}=n

ENGINEERING CAUTION

Always State Which Secondary Turns Define Ns

A center-tapped secondary may have two equal half-windings but only one half is active during a given rectification interval. A full-bridge secondary uses the complete winding.

Writing only ‘NP:NS = 4:1’ without defining the active secondary winding can create a factor-of-two design error.

3. Define the Effective Secondary Voltage Requirement

The secondary winding must provide enough voltage to overcome the required DC output voltage plus the effective rectifier, synchronous-rectifier, winding, and connection drops associated with the selected model.

VS,req=Vo+Vrect,eqV_{S,req}=V_o+V_{rect,eq}

For synchronous rectification, Vrect,eq may be an effective conduction-drop model rather than a fixed diode drop. At high current, winding and PCB resistance can also contribute enough voltage loss to matter.

Secondary ItemInclude When Relevant
DC output voltageMinimum, nominal, maximum regulated target.
Diode dropForward drop at actual current and temperature.
Synchronous rectifier dropRDS(on), current waveform, conduction interval, and connection loss.
Winding / lead dropSecondary DCR and RMS/average current.
PCB / connector dropHigh-current output path where significant.

4. Connect Turns Ratio to LLC Tank Gain

Using the common normalized LLC gain convention from Chapter 4, a generalized first-pass relationship between input bus, tank gain, turns ratio, and effective secondary voltage is:

VS,req≈KBMVinnV_{S,req}\approx\frac{K_BM V_{in}}{n}

Solving for the tank gain required at any operating point:

Mreq=nVS,reqKBVinM_{req}=\frac{nV_{S,req}}{K_BV_{in}}
Primary ExcitationKB in This Chapter
Half bridge0.5
Full bridge1.0

ENGINEERING CAUTION

Keep the Gain Convention Consistent with Chapter 4

The bridge factor and the definition of M are linked. Do not combine a turns-ratio equation from one normalization convention with a gain curve from another.

The equations here are internally consistent with M = 1 at series resonance using the stated KB values.

5. Calculate the Required Maximum and Minimum Gain

The maximum tank gain is usually required near minimum input voltage and maximum required secondary voltage:

Mreq,max⁡=nVS,max⁡KBVin,min⁡M_{req,\max}=\frac{nV_{S,\max}}{K_BV_{in,\min}}

The minimum tank gain is usually required near maximum input voltage and minimum required secondary voltage:

Mreq,min⁡=nVS,min⁡KBVin,max⁡M_{req,\min}=\frac{nV_{S,\min}}{K_BV_{in,\max}}

These equations should be evaluated at physically possible operating corners. If output voltage is fixed, VS,min and VS,max may differ only because of load-dependent rectifier and winding drop.

LLC gain window diagram showing Vin,min, Vin,nom, and Vin,max mapped onto a gain-versus-normalized-frequency curve with Mreq,max, M approximately 1, and Mreq,min.

Figure 6-1. Required LLC gain window mapped from minimum, nominal, and maximum input voltage through bridge factor, transformer ratio, and effective secondary voltage.

6. Choose a Nominal Unity-Gain Turns Ratio

A common starting objective is to place nominal input voltage and nominal output near M = 1 at series resonance. The general target ratio at a chosen nominal gain is:

ntarget=KBMnomVin,nomVS,nomn_{target}=\frac{K_BM_{nom}V_{in,nom}}{V_{S,nom}}

If Mnom = 1:

n0=KBVin,nomVS,nomn_0=\frac{K_BV_{in,nom}}{V_{S,nom}}

Unity-gain nominal operation is a useful reference, not a mandatory rule. A designer may intentionally bias nominal operation slightly above or below resonance if efficiency, gain margin, ZVS, controller frequency limits, or component tolerance make another placement better.

7. Integer Turns Turn a Continuous Ratio into a Discrete Design

The continuous ratio calculated above cannot be wound directly unless it happens to equal a ratio of practical integers. The realized transformer ratio is:

nactual=NPNSn_{actual}=\frac{N_P}{N_S}

If a provisional primary turn count is being explored, a candidate secondary turn count can be estimated as:

NS,cand≈round⁡(NPntarget)N_{S,cand}\approx\operatorname{round}\left(\frac{N_P}{n_{target}}\right)

In practice, candidate generation is better than one-shot rounding. Evaluate several nearby NP/NS pairs because a one-turn change can significantly move the ratio when NS is small.

8. Ratio Quantization Must Be Fed Back into the Gain Model

A useful ratio-error metric is:

εn=nactual−ntargetntarget×100%\varepsilon_n=\frac{n_{actual}-n_{target}}{n_{target}}\times100\%

At the same input and secondary-voltage requirement, required tank gain scales directly with turns ratio:

Mreq,actualMreq,target=nactualntarget\frac{M_{req,actual}}{M_{req,target}}=\frac{n_{actual}}{n_{target}}

SOLIDMAG ENGINEERING INSIGHT

Integer Turns Belong Inside the Resonant-Tank Iteration

Rounding the turns ratio is not a manufacturing detail performed after the electrical design.

The integer ratio changes required gain and reflected load, so the Chapter 4 gain curves must be recalculated with the actual NP/NS pair.

9. Increasing or Decreasing n Moves the Operating Window

Ratio ChangeGain / Frequency ConsequenceLikely Tradeoff
Increase n = NP/NSRequires more tank gain for the same Vin and VoutPushes low-line operation lower in frequency; may increase boost current and reduce capacitive-boundary margin.
Decrease n = NP/NSRequires less tank gainPushes high-line operation higher in frequency; may increase switching/core/winding AC loss.

The best ratio typically balances the low-line boost requirement against the high-line frequency requirement while placing a preferred nominal point near an efficient region of the gain curve.

10. Turns Ratio Changes the Reflected Load and Quality Factor

Turns ratio also changes the load reflected into the primary FHA model. Using the Chapter 4 full-wave convention:

Rac=8π2n2RoR_{ac}=\frac{8}{\pi^2}n^2R_o

The Chapter 4 quality-factor convention is:

Q=ZrRacQ=\frac{Z_r}{R_{ac}}

For fixed tank impedance and DC load:

Q∝1n2Q\propto\frac{1}{n^2}

For small ratio changes:

ΔQQ≈−2Δnn\frac{\Delta Q}{Q}\approx-2\frac{\Delta n}{n}

ENGINEERING CAUTION

Changing n Changes Both Required Gain and the Gain Curve

A turns-ratio change does not merely move the required-gain point on a fixed curve. It also changes Rac and therefore Q.

Recalculate both the required gain and the gain family after selecting integer turns.

11. Secondary Rectifier Topology Changes the Meaning of Ns

Secondary TopologyHow Ns Should Be Defined for Ratio Calculations
Full-wave bridge / full-bridge synchronous rectifierUse the turns across the complete active secondary winding.
Center-tapped full-wave rectifierUse the turns on the half-winding that conducts during the corresponding half-cycle unless the chosen model explicitly defines otherwise.
Current doublerDefine the effective secondary winding and rectifier model consistently with the FHA/load transformation used.
Multiple secondariesDefine each winding ratio independently from the primary and specify which winding controls regulation.

ENGINEERING CAUTION

Do Not Mix Total Center-Tapped Turns with Active Half-Winding Turns

This is one of the easiest ways to create a factor-of-two error in voltage ratio and reflected load.

Production drawings should specify turns on each physical section, not only a shorthand ratio.

12. Half-Bridge and Full-Bridge Excitation Require Different Ratios

With the gain convention used here, a half bridge contributes KB = 0.5 while a full bridge contributes KB = 1.0. For the same input bus, output voltage, and M, the full-bridge design therefore requires approximately twice the primary-to-secondary ratio of the half-bridge design.

Primary BridgeKBPractical Ratio Trend
Half bridge0.5Lower NP/NS for the same Vin, Vout, and M.
Full bridge1.0Approximately double NP/NS relative to the half bridge under the same stated convention.

The full bridge also changes primary current and semiconductor utilization, so bridge selection should be frozen before final transformer turns are released.

13. Rectifier Drop, Wiring Drop, and Regulation Margin Matter

The effective secondary target should include enough margin for real conduction loss without arbitrarily inflating the transformer ratio.

  • Rectifier or synchronous-rectifier conduction drop at the relevant current.
  • Secondary winding copper drop at operating temperature.
  • Lead, pin, PCB, connector, or busbar drop where significant.
  • Required output regulation tolerance.
  • Control-loop headroom and transient recovery requirement.

SOLIDMAG ENGINEERING INSIGHT

Loss Compensation Should Be Modeled, Not Hidden in a Mystery Ratio Margin

A vague instruction to ‘add 5% turns-ratio margin’ hides the reason for the margin and can distort the gain window.

Model the voltage drops explicitly so the ratio can be traced back to real electrical requirements.

EARLY ENGINEERING ACCESS

Get Your First Custom Magnetic Design for $49

Need a custom inductor, flyback transformer, or currently supported LLC/resonant transformer design for a real project? SolidMagnetics Early Engineering Access gives you a lower-cost way to evaluate the platform while it continues to expand.

STANDARD SINGLE DESIGN PRICE: $249   •   EARLY ACCESS PRICE: $49

Use coupon code EARLYACCESS. Your supported design package can include:

  • Candidate magnetic design output and recommended design direction
  • SolidWorks Reference CAD and STEP export where supported
  • Engineering drawings, BOM, winding, and design data where supported
  • A practical starting point for component matching, simulation, prototyping, or further development

Offer details: Limited to the first 10 qualified paid projects. One discounted project per customer. Expires February 12, 2027, or when all 10 uses are claimed, whichever comes first.

SolidMagnetics-generated designs are engineering starting points intended to accelerate development. Final component selection, manufacturability, tolerances, winding construction, insulation, creepage and clearance, thermal performance, regulatory requirements, and production suitability must be verified for the intended application.

14. Turns Ratio Must Be Verified Against Frequency Limits

After selecting a candidate n, calculate Mreq at every important input/output corner, then find the switching frequency required from the Chapter 4 gain curves.

CheckAcceptable Outcome
Low-line / max-output gainReachable above the minimum safe switching frequency with inductive margin.
Nominal pointLocated in a preferred efficiency and ZVS region, often near resonance.
High-line / min-output gainReachable below the maximum allowed switching frequency.
Light loadDoes not require excessive frequency or lose required soft switching.
Tolerance cornersGain still reachable after Lm, Lr, Cr, turns, and voltage-drop tolerances.
LLC turns-ratio candidate comparison showing 32:8, 33:8, and 34:8 transformer ratios on a gain map, with low-line, nominal, and high-line required-gain points and the effect of increasing n.

Figure 6-2. Turns-ratio candidate comparison on an LLC gain map showing how increasing n moves all required-gain points upward and decreasing n moves them downward.

15. Turns Ratio Also Influences ZVS and Current Stress

A higher ratio can demand more low-line boost gain and resonant current, while a lower ratio can force high-line operation farther above resonance. Either choice can affect primary ZVS margin and transformer current.

  • Low-line boost operation can increase tank RMS current and conduction loss.
  • High-line high-frequency operation can reduce resonant current and weaken available ZVS commutation current at light load.
  • Changing n changes reflected load and Q, which reshapes the gain/phase boundary.
  • Secondary current and conduction loss also move because the transformer ratio changes current scaling.

ENGINEERING CAUTION

A Ratio That Meets Voltage Regulation Can Still Be a Poor Soft-Switching Choice

Do not approve n from the DC output equation alone.

The selected ratio must also preserve the operating-region, ZVS, current, and thermal margins established in Chapters 3–5.

16. Ideal Current Ratio Provides a Winding-Current Cross-Check

The ideal transformer current relationship provides a useful consistency check between primary and secondary current models:

ISIP=n\frac{I_S}{I_P}=n

Real LLC winding currents are not simple DC quantities, so conductor sizing still requires the actual RMS waveforms. The ideal ratio is useful for catching gross modeling or connection errors, not for replacing waveform analysis.

Chapter 10 develops primary and secondary conductor selection from the actual RMS and high-frequency current requirements.

17. Ratio Alone Does Not Determine Flux — Absolute Turns Still Matter

Many integer pairs can produce nearly the same ratio, but they do not produce the same magnetic design. Absolute primary turns determine flux excursion for the actual primary voltage waveform.

The general volt-second relationship is:

ΔB=1NPAe∫t1t2vP(t)dt\Delta B=\frac{1}{N_PA_e}\int_{t_1}^{t_2}v_P(t)\,dt

Therefore 33:8 and 66:16 have the same ideal ratio but very different turns count, window utilization, copper length, magnetizing inductance realization, leakage, capacitance, and flux per turn.

Chapter 9 selects the actual absolute turns together with core area, material, flux density, and saturation margin.

18. Winding Polarity and Secondary Definition Must Be Unambiguous

The turns-ratio specification must include winding polarity, start/finish terminals, and the exact definition of every section. Resonant converters are especially sensitive to winding arrangement because split windings and interleaving may be used to control leakage.

  • Primary start and finish terminals.
  • Secondary start and finish terminals.
  • Dot convention on the schematic and drawing.
  • Turns per physical winding section.
  • Series or parallel connection of split sections.
  • Center-tap definition where used.
  • Any auxiliary/bias winding polarity and ratio.

ENGINEERING CAUTION

A Correct Numerical Ratio with Wrong Polarity Is Still a Failed Transformer

Polarity errors can reverse secondary conduction, upset synchronous rectification, prevent correct resonant power transfer, or create destructive stress.

Turns ratio and polarity should both be verified in production.

19. Worked Example — 380–420 VDC to 48 V / 500 W Half-Bridge LLC

WORKED DESIGN EXAMPLE

380–420 VDC to 48 V / 500 W Half-Bridge LLC

This example continues the 500 W / 48 V design thread from Chapters 4 and 5. Assume a 380–420 VDC PFC bus, 400 V nominal input, half-bridge excitation, 48 V regulated output, and an illustrative 0.5 V equivalent secondary rectifier / connection drop.

The Chapter 4 tank uses fr = 150 kHz, Ln = 5, and Q = 0.5 at the provisional full-load design point. This example selects the turns ratio; Chapter 9 will later determine whether the absolute turns are magnetically practical.

Step 1 — Define the effective secondary voltage:

VS,req=48+0.5=48.5 VV_{S,req}=48+0.5=48.5\ \mathrm{V}

Step 2 — Place nominal input near unity tank gain. With KB = 0.5:

n0=0.5(400)(1.0)48.5≈4.124n_0=\frac{0.5(400)(1.0)}{48.5}\approx4.124

Step 3 — Choose a nearby integer ratio. A 33-turn primary and 8-turn secondary give:

nactual=338=4.125n_{actual}=\frac{33}{8}=4.125

The ratio error is only:

εn≈4.125−4.1244.124×100%≈0.024%\varepsilon_n\approx\frac{4.125-4.124}{4.124}\times100\%\approx0.024\%

Step 4 — Calculate required gain at minimum input:

Mreq,380=4.125(48.5)0.5(380)≈1.053M_{req,380}=\frac{4.125(48.5)}{0.5(380)}\approx1.053

At nominal input:

Mreq,400=4.125(48.5)0.5(400)≈1.000M_{req,400}=\frac{4.125(48.5)}{0.5(400)}\approx1.000

At maximum input:

Mreq,420=4.125(48.5)0.5(420)≈0.953M_{req,420}=\frac{4.125(48.5)}{0.5(420)}\approx0.953

Using the illustrative Chapter 4 gain curve with Ln = 5 and Q = 0.5, M ≈ 1.053 occurs near Fn ≈ 0.88 and M ≈ 0.953 occurs near Fn ≈ 1.13. For fr = 150 kHz, that corresponds to approximately 132 kHz at low line and 169 kHz at high line in the simplified FHA model.

InputRequired GainIllustrative FnIllustrative fs for fr = 150 kHz
380 V≈ 1.053≈ 0.88≈ 132 kHz
400 V≈ 1.0001.00150 kHz
420 V≈ 0.953≈ 1.13≈ 169 kHz
LLC gain curve for a 33:8 transformer turns ratio showing operating points at 380 V, 400 V, and 420 V input with normalized frequencies near 0.88, 1.00, and 1.13.

Figure 6-3. Worked-example LLC gain curve showing the 33:8 turns-ratio operating points at 380 V, 400 V, and 420 V input.

20. Compare Nearby Integer-Turn Candidates

A nearby integer candidate can move the required gain enough to matter. Compare three 8-turn secondary candidates:

NP:NSnMreq @ 380 VMreq @ 400 VMreq @ 420 V
32:84.0001.0210.9700.924
33:84.1251.0531.0000.953
34:84.2501.0851.0310.982

The 32:8 candidate reduces the low-line boost requirement but pushes high-line operation farther above resonance. The 34:8 candidate does the opposite. The 33:8 ratio places the nominal point almost exactly at M = 1 for the stated assumptions.

SOLIDMAG ENGINEERING INSIGHT

The Nearest Ratio Is Not Always the Best Ratio

A slightly larger ratio error can be worthwhile if it improves ZVS margin, frequency range, current stress, or absolute-turn feasibility.

Candidate ratios should be ranked by complete converter and magnetic performance, not percentage ratio error alone.

21. Recalculate Q, Gain, and Frequency After Choosing Integer Turns

After selecting integer turns, return to the Chapter 4 model and update both required gain and reflected load. The new n changes Rac and Q, which changes the gain curve used to determine frequency.

  • Recalculate nactual from the selected integer turns.
  • Recalculate Mreq at every line/load/output corner.
  • Recalculate Rac from nactual².
  • Recalculate Q for each load.
  • Regenerate the FHA gain and phase curves.
  • Recalculate minimum and maximum required switching frequency.
  • Recheck the inductive/capacitive boundary.
  • Recheck resonant current and magnetizing current.
  • Recheck primary ZVS and secondary commutation margins.

ENGINEERING CAUTION

Do Not Reuse the Old Q After Changing n

Because Rac scales with n², even a modest turns-ratio change modifies the load-normalized tank model.

This feedback step is required before the ratio can be considered electrically closed.

22. Design Handoff to Magnetizing Inductance

At the end of Chapter 6, the design should provide the following information to Chapter 7:

  • Selected NP/NS ratio and candidate integer turns pair.
  • Definition of the active secondary winding used for NS.
  • Primary bridge factor and secondary rectifier convention.
  • Required gain at minimum, nominal, and maximum input.
  • Resulting switching-frequency range after integer-ratio feedback.
  • Reflected-load and Q values after the ratio update.
  • Primary and secondary current envelopes associated with the selected ratio.
  • Any ratio alternatives retained for later magnetic optimization.

Chapter 7 now selects and verifies magnetizing inductance Lm against gain, circulating current, and ZVS requirements.

  1. Define NP/NS and the active secondary winding convention.
  2. Define KB from the primary bridge.
  3. Calculate effective secondary voltage including modeled conduction drops.
  4. Use the Chapter 4 gain window to estimate a continuous target ratio.
  5. Choose a preferred nominal operating gain, often near M = 1.
  6. Generate several nearby integer NP/NS candidates.
  7. Calculate ratio error for each candidate.
  8. Calculate Mreq,min and Mreq,max for each candidate.
  9. Recalculate Rac and Q for each candidate.
  10. Regenerate gain/frequency curves using the candidate’s actual n.
  11. Reject candidates that exceed frequency or inductive-region limits.
  12. Compare current, ZVS, loss, and thermal implications.
  13. Retain candidates whose absolute primary/secondary turns can later satisfy flux, Lm, winding fit, and isolation.
  14. Select the preferred ratio and hand it to Chapter 7 / Chapter 9 for magnetic realization.
LLC turns-ratio design workflow showing input and output requirements, continuous Np/Ns ratio estimation, integer turn candidates, reflected load Rac, quality factor Q feedback, gain checks, ZVS margin, and magnetic handoff.

Figure 6-4. LLC turns-ratio design workflow from input/output and gain requirements through continuous ratio, integer candidate generation, gain/Q feedback, frequency and ZVS checks, and magnetic handoff.

24. Chapter 6 Engineering Checklist

  • NP/NS convention is defined.
  • The active secondary winding used for NS is unambiguous.
  • Half-bridge or full-bridge KB is correct.
  • Rectifier topology and equivalent voltage drop are defined.
  • Minimum, nominal, and maximum required gain are calculated.
  • Nominal ratio target is derived from the chosen operating point.
  • Several integer-turn candidates have been evaluated.
  • Ratio quantization error is known.
  • Rac and Q are recalculated for the actual ratio.
  • Frequency range is recalculated using actual n and Q.
  • Low-line operation retains boost and inductive margin.
  • High-line operation remains below the practical maximum switching frequency.
  • Primary ZVS and secondary commutation are rechecked.
  • Primary/secondary current envelopes are consistent with the ratio.
  • Absolute turns remain provisional until flux, core, Lm, and winding fit are checked.
  • Winding polarity, center taps, split sections, and auxiliary winding definitions are documented.

CHAPTER TAKEAWAY

Turns Ratio Is Closed Only After the Tank Model Is Recalculated

A ratio is not finished when NP/NS is close to the continuous target.

It is finished when the integer ratio, reflected load, Q, gain, frequency range, soft-switching margin, current, and magnetic feasibility all agree.

25. Conclusion — The Best Ratio Places the Converter in a Practical Gain Window

The LLC transformer turns ratio determines where the converter must operate on its resonant gain curve. It should therefore be selected from the complete gain window rather than from input voltage divided by output voltage alone.

A practical design chooses a preferred nominal operating point, generates nearby integer ratios, recalculates required gain and reflected load, and rejects candidates that create excessive boost demand, excessive high-frequency operation, poor ZVS margin, or impractical magnetic construction.

With the turns ratio now defined, Chapter 7 can focus on the other transformer parameter that directly shapes the LLC gain and soft-switching behavior: magnetizing inductance.

Technical References for This Chapter

The turns-ratio and FHA load relationships in this chapter follow common LLC design conventions. Final designs should use the gain definition, bridge factor, rectifier model, and turns convention associated with the selected controller and system topology.

RESONANT CONVERTER TRANSFORMER DESIGN

Ready to Design a Resonant Converter Transformer?

Enter your resonant-converter requirements and begin a SolidMagnetics transformer design workflow built around the electrical, magnetic, winding, thermal, mechanical, and manufacturing constraints that shape a practical LLC or related resonant transformer.

Use the design interface to define the converter operating range, transformer requirements, resonant and magnetizing inductance targets, winding priorities, isolation needs, thermal limits, physical constraints, and optimization goals.

Return to the Ultimate Guide to Resonant Converter Transformer Design

READY TO APPLY THIS?

Turn Your Requirements Into a Real Magnetic Design

If you are working on a real inductor, flyback transformer, or supported LLC/resonant transformer project, SolidMagnetics can help you move faster from electrical requirements to calculated magnetic geometry and engineering output.

FOUNDING EARLY ENGINEERING ACCESS: $249   →   $49

Use coupon code EARLYACCESS for the Single Design package. This offer is intended for engineers who want to evaluate the current SolidMagnetics workflow and provide practical feedback that helps improve the platform.

What the Current Package Can Include

  • Requirements and feasibility review
  • Candidate design comparison and recommended design
  • Electrical, magnetic, loss, and thermal calculations
  • SolidWorks Reference CAD and STEP files where supported
  • Drawings, BOM, winding, and engineering data where supported
  • A basis for comparing custom geometry with commercial core and bobbin options

Early Access Offer Details

  • Single Design standard price: $249
  • Early Engineering Access price: $49
  • Coupon code: EARLYACCESS
  • Limited to 10 total qualified paid projects
  • One discounted project per customer
  • Expires February 12, 2027, or when all 10 uses are claimed
  • Brief post-delivery feedback is requested

The standard package provides a Reference CAD representation of the generated design rather than the complete underlying SolidMagnetics parametric automation structure. Fully parametric engineering CAD may be available separately for qualifying advanced or Enterprise projects.

Early Access calculations, CAD, drawings, and related deliverables are intended to accelerate engineering evaluation and prototype development. Final mechanical, electrical, thermal, insulation, regulatory, manufacturing, and production validation remains the responsibility of the customer and their engineering team.

ABOUT THE AUTHOR

Stan Gibson

Electrical Engineer & Founder, SolidMagnetics

Stan Gibson is an electrical engineer and founder of SolidMagnetics, an engineering platform focused on magnetic-component design automation. His work includes power electronics, inductor and transformer design, magnetic-core selection, winding design, thermal analysis, and manufacturable CAD development. Through SolidMagnetics, he develops technical guides, calculators, and automated design tools intended to help engineers move from electrical requirements to practical magnetic-component designs.

View Full Author Profile