Chapter 2 established LLC as the primary unidirectional design thread for this Ultimate Guide. Chapter 3 explains how the converter moves through its operating regions: how switching frequency changes gain and phase, why the tank should remain in the intended inductive region for reliable primary ZVS, when the secondary current can approach zero-current commutation, and how magnetizing inductance, load, dead time, device charge, and transformer parasitics determine whether soft switching is actually achieved.
By the end of this chapter, you should be able to interpret operation above, near, and below resonance; distinguish inductive and capacitive tank behavior; understand the charge requirement for primary ZVS; identify secondary ZCS opportunities; and build an operating-corner verification plan for the quantitative tank design of Chapter 4.
← Previous Chapter
Chapter 2 — Resonant Converter Topologies: SRC, PRC, LCC, LLC, and CLLLC
In This Chapter — Click to Expand
Table of Contents
DESIGN ASSUMPTION
Primary-Referenced First-Harmonic Operating Model
This chapter uses a primary-referred LLC model to explain operating regions. First-harmonic analysis is useful for gain and phase interpretation but does not reproduce every switching transition, nonlinear device capacitance, rectifier commutation event, transformer parasitic resonance, burst cycle, or transient.
Use the analytical model to establish the intended region, then verify important corners with switching simulation and hardware waveforms.
1. The LLC Converter Regulates by Moving Through Operating Regions
An LLC converter normally regulates output voltage by changing switching frequency rather than by applying conventional wide-range PWM. The bridge excites the resonant network, and moving switching frequency changes tank impedance, current phase, and voltage gain.
The same transformer can therefore experience substantially different electrical conditions as line and load move. At one corner it may operate above resonance with gain below the nominal value; at another it may operate below resonance to obtain boost gain; at light load the controller may move to high frequency or burst mode. The magnetic design must remain acceptable throughout that operating map.
SOLIDMAG ENGINEERING INSIGHT
The LLC Transformer Does Not Have One Operating Frequency
A design checked only at nominal switching frequency can miss the condition that produces the highest core loss, highest RMS current, weakest ZVS margin, or most difficult EMI behavior.
The practical transformer input is an operating-frequency window linked to specific line and load corners.
2. LLC Resonant Tank Reference Quantities
The series resonant angular frequency is:
The corresponding series resonant frequency is:
The lower characteristic frequency associated with Lr + Lm and Cr is:
The series-pair characteristic impedance is:
The normalized inductance ratio is:
These quantities establish the scale of the operating map. Chapter 4 combines them with reflected load and quality factor to calculate gain.
3. Normalized Frequency Makes the Operating Map Easier to Read
Normalized switching frequency is defined as:
Therefore:
| Normalized Frequency | Meaning |
|---|---|
| Fn = 1 | Switching at the Lr–Cr series resonance. |
| Fn > 1 | Switching above series resonance. |
| Fn < 1 | Switching below series resonance. |
Normalized frequency lets the same design logic apply to converters with very different absolute resonant frequencies and makes load-dependent gain families easier to compare.
4. Operation Near the Series Resonant Frequency
Near the Lr–Cr series resonant frequency, the ideal series reactances cancel. Tank current is then limited mainly by the reflected load, the magnetizing branch, and real losses. In many LLC designs this region is selected near the nominal high-power operating point.
| Quantity Near fr | Typical Trend |
|---|---|
| Tank current | Strong and relatively sinusoidal. |
| Gain | Near the nominal design region in many LLC implementations. |
| Circulating current | Usually lower than in deep boost operation below resonance. |
| Primary ZVS | Often favorable if sufficient inductive current remains through dead time. |
| Magnetic loss | Can be substantial because the converter may process full power near the intended resonant frequency. |

Figure 3-1. Conceptual LLC gain-versus-normalized-frequency family showing the series resonant point, lower characteristic region, inductive operating area, capacitive area, and representative load curves.
5. Operation Above Resonance
When switching frequency rises above series resonance, the tank appears increasingly inductive. Current generally lags the applied fundamental voltage, gain tends to fall, and regulation can be obtained by increasing frequency.
This region is attractive for primary ZVS, but an excessively high maximum frequency can increase switching loss, gate-drive loss, proximity loss, dielectric loss, and core loss mechanisms even while tank current falls.
ENGINEERING CAUTION
High Frequency Is Not a Free Regulation Range
The controller may be capable of commanding a high frequency, but the transformer, resonant components, and semiconductors still have frequency-dependent losses.
Set maximum frequency from the combined gain, efficiency, magnetic, EMI, and controller constraints.
6. Operation Below Resonance
Below series resonance, the LLC converter can provide gain above the nominal resonance-region value. This boost capability is useful at low input voltage or high required output ratio.
But below resonance is not one universally safe region. Depending on load and Ln, the tank may remain inductive or cross toward capacitive operation. Normal regulation is generally kept on the inductive side so primary commutation remains favorable.
SOLIDMAG ENGINEERING INSIGHT
Boost Gain and ZVS Margin Compete for Design Space
Lowering frequency can produce more gain, but it also tends to increase resonant current and move the converter closer to the capacitive boundary.
Required maximum gain should be achieved with operating margin rather than directly on the boundary.
7. The Lower Characteristic Frequency and Frequency Separation
The lower characteristic frequency can be normalized to fr. With Ln = Lm/Lr:
| Ln Trend | Typical Effect |
|---|---|
| Lower Ln | More magnetizing current, potentially more available gain and commutation current, but higher circulating loss. |
| Higher Ln | Lower magnetizing current and conduction loss, but less boost capability and less commutation-current margin. |
ENGINEERING CAUTION
fm Is Not a Universal Capacitive-Boundary Frequency
fm is a useful characteristic frequency, but the exact inductive-to-capacitive boundary depends on load and the complete tank solution.
Do not use fm alone as a hard minimum switching frequency.
8. Inductive and Capacitive Input-Impedance Regions
A practical way to describe the region is by the phase of the input impedance:
An inductive input impedance satisfies:
A capacitive input impedance satisfies:
In the inductive region, current lags the bridge voltage in the fundamental model. In the capacitive region, current leads. That phase reversal is one reason the capacitive region is generally excluded from normal regulated operation.

Figure 3-2. Bridge voltage and resonant-current phase comparison for inductive, near-resonant, and capacitive LLC operation.
9. Why the Inductive Region Enables Primary-Side ZVS
Primary-side zero-voltage switching means the MOSFET is commanded on after the switch-node voltage has transitioned close to the required rail. Resonant and magnetizing currents supply the current that charges one device output capacitance and discharges the other during dead time.
Inductive operation matters because the current direction at the transition should support that commutation rather than oppose it.
SOLIDMAG ENGINEERING INSIGHT
ZVS Is a Commutation-Charge Problem
A gain curve can identify the intended inductive region, but actual ZVS depends on whether enough current exists during dead time to move the nonlinear switch-node charge.
Magnetizing current, resonant current, dead time, device output charge, bus voltage, temperature, and load all matter.
10. Dead Time and the Charge Required for ZVS
A practical first-pass ZVS check compares available commutation charge with the charge required to transition the switch node. A necessary condition is:
If current is approximately constant through dead time:
| Variable | Meaning |
|---|---|
| Qcomm | Charge supplied during dead time by resonant and magnetizing current. |
| Qreq | Charge required to move the switch node, based on actual device output-charge behavior and circuit parasitics. |
| td | Effective dead time. |
| icomm | Approximate available commutation current. |
ENGINEERING CAUTION
Do Not Size ZVS Margin from One Datasheet Coss Number
MOSFET output capacitance is nonlinear. A single small-signal Coss value can misrepresent the charge required for a large voltage transition.
Use output-charge / Eoss data or an appropriate switching model, then confirm with VDS and gate waveforms.

Figure 3-3. Primary LLC ZVS commutation sequence during dead time showing current charging and discharging MOSFET output capacitances before low-voltage turn-on.
11. Secondary-Side ZCS and Rectifier Commutation
On the secondary side, LLC operation can produce current that naturally approaches zero near a rectifier commutation event. This can reduce diode reverse-recovery stress and can allow low-current synchronous-rectifier turn-off.
A simplified target is:
Actual secondary current depends on frequency, load, turns ratio, leakage, rectifier topology, and parasitics. At some corners current can reverse before a synchronous rectifier turns off.
ENGINEERING CAUTION
Secondary ZCS Is Not Guaranteed Across the Entire Load Range
A rectifier that turns off near zero current at nominal load may behave differently during light load, boost operation, burst transitions, or reverse-current conditions.
Validate synchronous-rectifier timing against the real secondary current waveform.

Figure 3-4. Secondary current and rectifier commutation showing a near-zero-current turn-off and a late synchronous-rectifier turn-off that permits reverse current.
12. Magnetizing Inductance Controls More Than No-Load Current
Magnetizing inductance directly controls the current needed to establish transformer flux and therefore influences the current available for commutation. The idealized slope is:
For a roughly constant applied primary voltage over a short interval:
Reducing Lm increases magnetizing current and may improve ZVS margin, but it also raises RMS current and conduction loss. Increasing Lm lowers circulating current but can weaken soft-switching margin, especially at light load.
Chapter 7 develops the magnetizing-inductance tradeoff in detail.
EARLY ENGINEERING ACCESS
Get Your First Custom Magnetic Design for $49
Need a custom inductor, flyback transformer, or currently supported LLC/resonant transformer design for a real project? SolidMagnetics Early Engineering Access gives you a lower-cost way to evaluate the platform while it continues to expand.
STANDARD SINGLE DESIGN PRICE: $249 • EARLY ACCESS PRICE: $49
Use coupon code EARLYACCESS. Your supported design package can include:
- Candidate magnetic design output and recommended design direction
- SolidWorks Reference CAD and STEP export where supported
- Engineering drawings, BOM, winding, and design data where supported
- A practical starting point for component matching, simulation, prototyping, or further development
Offer details: Limited to the first 10 qualified paid projects. One discounted project per customer. Expires February 12, 2027, or when all 10 uses are claimed, whichever comes first.
SolidMagnetics-generated designs are engineering starting points intended to accelerate development. Final component selection, manufacturability, tolerances, winding construction, insulation, creepage and clearance, thermal performance, regulatory requirements, and production suitability must be verified for the intended application.
13. Load Changes the Gain Curve and the Soft-Switching Boundary
The reflected load changes tank damping, so a heavy-load gain curve and a light-load gain curve are not identical. The same switching frequency can therefore have different phase and gain margin at different loads.
| Load Condition | Typical LLC Consequence |
|---|---|
| Heavy load | Higher tank current and copper / semiconductor conduction stress. |
| Nominal load | Often placed near resonance or another selected high-efficiency point. |
| Light load | Tank current falls; magnetizing current becomes a larger fraction of total current; ZVS margin can weaken. |
| No load | Frequency may rise or the controller may enter burst / skip operation. |
The inductive-to-capacitive boundary must therefore be evaluated over the relevant load range, not at only one nominal load.
14. Quality Factor as a Load Parameter
A common first-harmonic load parameter is quality factor. One frequently used convention is:
Rac is the reflected AC load under the chosen analysis convention. Other references may define Q reciprocally or normalize the load differently.
ENGINEERING CAUTION
Quality-Factor Definitions Are Not Universal
Two application notes can use the same symbol Q for reciprocal definitions.
Confirm Q, Ln, turns ratio, and reflected-load definitions before using a published gain equation or chart.
15. Light-Load, No-Load, and Burst-Mode Operation
At very light load, continuous high-frequency operation can waste power in magnetizing current, gate drive, circulating current, and core loss. Controllers therefore often enter burst, skip, or pulse-cluster operation.
- Burst mode reduces average switching events but creates low-frequency envelope modulation.
- Active burst pulses can still have substantial flux excursion even when average power is low.
- Audible-noise risk can increase if burst repetition or mechanical excitation falls in the audible range.
- ZVS behavior at the first and last pulse of a burst can differ from steady state.
- Output ripple and EMI change because operation is no longer continuously periodic.
SOLIDMAG ENGINEERING INSIGHT
Light Load Can Be a Switching Problem Even When It Is Not a Thermal Problem
Low average power does not guarantee benign switching transitions.
Verify burst entry, burst exit, no-load frequency limits, ZVS recovery, and audible behavior separately from full-load thermal validation.
16. Startup, Overload, and Large-Signal Conditions
Startup and overload are large-signal conditions that may force the converter far from its nominal operating region. At startup, the output is discharged and the controller may command frequencies, pulse patterns, or current limits that do not appear in steady-state gain plots.
- Maximum resonant current during startup and short-circuit recovery.
- Minimum commanded frequency and proximity to the capacitive boundary.
- Transformer flux excursion before regulation is established.
- Controller current-limit or frequency-foldback behavior.
- Burst, soft-start, and restart timing.
- Secondary rectifier stress with an uncharged output capacitor.
- Primary ZVS behavior while frequency and current are transitioning.
ENGINEERING CAUTION
Steady-State Gain Curves Do Not Prove Startup Safety
A converter can be well behaved at every steady-state line/load point and still overstress the transformer or semiconductors during startup or fault recovery.
Include startup, overload, and protection behavior in the magnetic operating-envelope review.
17. Synchronous-Rectifier Timing Is Part of Resonant Operation
Synchronous rectification can reduce secondary conduction loss, especially for low-voltage high-current outputs, but timing should follow the actual resonant current rather than only primary gate signals.
| SR Timing Error | Potential Consequence |
|---|---|
| Turns on too early | Reverse or cross-conduction current and disturbance of resonant commutation. |
| Turns off too early | Body-diode conduction and higher secondary loss. |
| Turns off too late | Reverse current from output back into the transformer and loss of near-ZCS turn-off. |
| Timing not adjusted with load/frequency | Different behavior across the LLC operating map. |
Transformer leakage and winding capacitance can shift secondary-current zero crossings and ringing, so final SR timing should be validated with the realized transformer.
18. Operating-Region Design Map
A useful LLC operating map should overlay more than gain. At each important operating point record:
- Input voltage and output load.
- Required converter gain.
- Switching frequency and normalized frequency.
- Input-impedance phase or inductive/capacitive classification.
- Primary resonant current and magnetizing current.
- Estimated ZVS commutation-charge margin.
- Secondary current at rectifier turn-off.
- Transformer flux-density excursion.
- Core and winding loss.
- Controller mode: continuous, burst, startup, overload, or protection.

Figure 3-5. LLC operating-corner map overlaying gain, normalized frequency, inductive/capacitive region, ZVS margin, load, and transformer stress.
SOLIDMAG ENGINEERING INSIGHT
Connect Circuit Behavior to Magnetic Stress
Each operating point should carry gain and ZVS information together with flux, RMS current, core loss, winding loss, and thermal information.
This traceability allows an automated design engine to reject candidates that meet gain but fail magnetic or switching constraints.
19. Recommended LLC Operating-Corner Verification Workflow
A practical verification sequence is:
- Calculate or simulate the required gain at minimum, nominal, and maximum input voltage.
- Determine switching frequency at each relevant load.
- Confirm each regulated point remains in the intended inductive region.
- Calculate resonant and magnetizing current waveforms.
- Check primary ZVS charge margin using dead time and device output-charge data.
- Check secondary current zero crossings and rectifier timing.
- Evaluate transformer flux and loss at each frequency/current corner.
- Include minimum and maximum Lm, Lr, Cr, turns ratio, and parasitic tolerances.
- Repeat for startup, overload, burst entry/exit, and no-load operation.
- Validate representative worst-case points in switching simulation.
- Confirm with prototype VDS, gate, primary-current, and secondary-current measurements.
20. Chapter 3 Engineering Checklist
Before moving to Chapter 4, verify that the operating model answers these questions:
- What are fr and fm?
- What normalized switching-frequency range is intended?
- Which line/load conditions operate above resonance?
- Which conditions require below-resonance boost?
- Where is the inductive-to-capacitive boundary for each important load?
- What ZVS phase/charge margin is required?
- What dead time is available?
- What device output charge must be commutated?
- How much resonant and magnetizing current is available during dead time?
- At what points does secondary current approach zero at turn-off?
- What happens at light load, no load, burst entry, and burst exit?
- What startup and overload conditions fall outside the steady-state map?
- Which points control transformer flux, current, loss, and temperature?
- Which tolerances can move the converter toward a hard-switching boundary?
CHAPTER TAKEAWAY
Soft Switching Must Be Verified Across the Operating Envelope
LLC creates favorable conditions for soft switching, but ZVS and ZCS occur only when the actual current, phase, dead time, device charge, load, resonant parameters, and transformer behavior support them.
Chapter 4 now converts this operating map into a quantitative tank design using Lr, Lm, Cr, Q, Ln, normalized frequency, and gain.
21. Conclusion — Soft Switching Is an Operating Condition, Not a Topology Label
LLC operation is best understood as movement through a frequency-dependent map. Above resonance, gain falls and the tank is generally strongly inductive. Near resonance, many designs reach a high-efficiency nominal region. Below resonance, gain rises but the converter approaches the load-dependent boundary where capacitive behavior and hard switching can occur.
Primary ZVS requires more than being on the correct side of a gain curve: sufficient commutation charge must exist during dead time. Secondary ZCS likewise depends on the actual current waveform and timing. Magnetizing inductance, load, device output charge, parasitics, burst strategy, and startup behavior therefore belong in the operating analysis.
With those regions established, Chapter 4 can select and optimize the resonant tank quantitatively instead of treating Lr, Lm, and Cr as isolated component values.
Technical References for This Chapter
The operating-region and soft-switching relationships in this chapter follow standard LLC resonant-converter analysis used in manufacturer application guidance. Final designs should use the selected controller datasheet, semiconductor output-charge / Eoss data, magnetic-component tolerances, switching simulation, and prototype measurements.
- STMicroelectronics AN2450 — LLC Resonant Half-Bridge Converter Design Guideline.
- Texas Instruments SLUA923 — Improving ZVS and Efficiency in LLC Converters.
- Texas Instruments Power Tips — Designing an LLC Resonant Half-Bridge Power Converter.
- Infineon — Resonant LLC Converter: Operation and Design.
Related SolidMagnetics Resources
Chapter 2 — Resonant Converter Topologies
Review the topology family before applying the LLC operating-region model.
Chapter 4 — Resonant Tank Design
Continue into Lr, Lm, Cr, Q, Ln, normalized frequency, and quantitative gain design.
Chapter 7 — Magnetizing Inductance
Develop Lm as a tradeoff among gain, circulating current, loss, and ZVS margin.
Chapter 8 — Controlled Leakage and Resonant Inductance
Translate Lr into external, integrated-leakage, or hybrid magnetic construction.
Chapter 11 — Winding Arrangement, Leakage, and Capacitance
Connect winding geometry to coupling, leakage, capacitance, AC loss, and EMI.
Ultimate Guide to Resonant Converter Transformer Design
RESONANT CONVERTER TRANSFORMER DESIGN
Ready to Design a Resonant Converter Transformer?
Enter your resonant-converter requirements and begin a SolidMagnetics transformer design workflow built around the electrical, magnetic, winding, thermal, mechanical, and manufacturing constraints that shape a practical LLC or related resonant transformer.
Use the design interface to define the converter operating range, transformer requirements, resonant and magnetizing inductance targets, winding priorities, isolation needs, thermal limits, physical constraints, and optimization goals.
Return to the Ultimate Guide to Resonant Converter Transformer Design
← Previous Chapter
Chapter 2 — Resonant Converter Topologies: SRC, PRC, LCC, LLC, and CLLLC
READY TO APPLY THIS?
Turn Your Requirements Into a Real Magnetic Design
If you are working on a real inductor, flyback transformer, or supported LLC/resonant transformer project, SolidMagnetics can help you move faster from electrical requirements to calculated magnetic geometry and engineering output.
FOUNDING EARLY ENGINEERING ACCESS: $249 → $49
Use coupon code EARLYACCESS for the Single Design package. This offer is intended for engineers who want to evaluate the current SolidMagnetics workflow and provide practical feedback that helps improve the platform.
What the Current Package Can Include
- Requirements and feasibility review
- Candidate design comparison and recommended design
- Electrical, magnetic, loss, and thermal calculations
- SolidWorks Reference CAD and STEP files where supported
- Drawings, BOM, winding, and engineering data where supported
- A basis for comparing custom geometry with commercial core and bobbin options
Early Access Offer Details
- Single Design standard price: $249
- Early Engineering Access price: $49
- Coupon code: EARLYACCESS
- Limited to 10 total qualified paid projects
- One discounted project per customer
- Expires February 12, 2027, or when all 10 uses are claimed
- Brief post-delivery feedback is requested
The standard package provides a Reference CAD representation of the generated design rather than the complete underlying SolidMagnetics parametric automation structure. Fully parametric engineering CAD may be available separately for qualifying advanced or Enterprise projects.
Early Access calculations, CAD, drawings, and related deliverables are intended to accelerate engineering evaluation and prototype development. Final mechanical, electrical, thermal, insulation, regulatory, manufacturing, and production validation remains the responsibility of the customer and their engineering team.